The COSA inspection and testing process is summarized as follows:
- Obtain records of the well and septic system from the MOA, Development Services Department (DSD). The objective is to verify if there is a documented and approved well & septic system on the property.
- Review a copy of the as-built survey to confirm that the well and septic system are actually on the property.
- LOCATE STANDPIPES: The first step of the site evaluation is to determine if the septic system shown in the MOA records matches the actual installation at the property. All of the septic system pipes shown in the MOA records will need to be present. If any of the pipes have been cut off and capped below grade, they will need to be found and extended above grade by the property owner prior to the arrival of the field engineer. This also applies to any pipes that are buried in the snow.
- Field measurements are taken to verify that the required separation distances between all impacted wells and septic systems are in compliance with the separation distances in effect at the time the system was installed. If there are encroachments, then it will be necessary to apply for waivers. There are additional engineering services/charges and MOA fees associated with such waivers.
- Verify that there is a functional monitoring tube in the drainfield so that an adequacy test can be performed. See the page entitled "Septic Adequacy Test" regarding the monitoring tubes. If one is not present a contractor will have to be hired to install one.
- Verify that the well casing extends at least 12 inches above grade. Wells drilled after August of 1998 must extend at least 18 inches above grade. If the casing is buried below grade or in the snow it should be located by the property owner prior to the arrival of the field engineer.
- Verify that the well wires are in conduit (protective pipe) where they extend above grade.
- Verify the well has a functional and removable sanitary seal. If it does not, one will have to be installed.
- Verify from the well log and or field evaluation that the well is cased and unperforated to a minimum of 40 feet, or if shallower, seated into bedrock.
- Pull water samples and have them tested for nitrates, bacteria, and arsenic.
- Verify that the septic tank has been pumped within the past 12 months. If not, arrange for it to be pumped. In many cases, pumping of the septic tank is necessary in order to safely run the septic adequacy test.
- Perform well and septic system adequacy tests.
- Complete the standardized COSA forms and submit them to the MOA for their review and approval.
f the well and or septic system are undocumented then additional engineering services will be required in order to document them to the satisfaction of the MOA.
he complete COSA process, including MOA review and approval takes about 3 weeks unless a concerted effort is made to expedite the process. The costs associated with the COSA are as follows:
ONSITE WELL and/or SEPTIC TESTING
Septic adequacy test and well flow test (without COSA paperwork) $700 Septic adequacy test (without well test or COSA paperwork) $500 Well flow test only (without septic test or COSA paperwork) $400 COSA paperwork processing fee or well/septic reports
(applies to new or re-issued COSA)$150 Water samples: arsenic, coliform bacteria, and nitrates (meets minimum COSA requirements) $180 RUSH Water samples: arsenic, coliform bacteria, and nitrates (meets minimum COSA requirements) $230 PIWA sample: For a list of contaminants, click here (includes COSA requirements) $380 Certificate of On-site Systems Approval processing fee (MOA charge) $430 Septic tank pumping in Anchorage $165 Septic tank pumping outside the Anchorage area varies Septic system pre-soak (Required if residence has been vacant for 30+ days) $400 Municipality of Anchorage imposed rush charge (MOA guarantees
review of COSA submittal within 24 hours). Payment of this fee is necessary
for all COSA submittal reviews required in less than 5 business days.$175 GEG, Ltd. rush charge (if the COSA is required in less than ten business days*) $50
*The routine time required to complete the COSA process is roughly 15 business days. A COSA can be completed faster (possibly less than 10 days) if the water samples are expedited through the lab and the COSA paperwork is expedited through our office and the MOA. Rush charges apply at the lab, MOA, and GEG, Ltd. When an order is placed with GEG, Ltd., potential deficiencies with the well and/or septic system are unknown; therefore, we cannot predict a job's completion date. We will take all reasonable steps to perform the required services in a timely manner and will make all rush jobs our highest priority.
note: prices are subject to change without notice
e encourage our clients to have their well and septic system tested as early as possible in the marketing process. Waiting until the house is sold and a closing date established before testing the well and septic system, can lead to problems if either is found to be inadequate. It is always best to identify problems early so there is adequate time to address the engineering, regulatory approval and financial aspects associated with the upgrade.
![]()
Engineering costs and permit fees
Well Flow Test
Septic Adequacy Test
Failed Septic System?
Order a Certificate of On-site Systems Approval