For undeveloped land, prior to digging test holes, it will be necessary to have the lot lines flagged by a registered land surveyor (about every 50-75 feet). In addition to having the property lines flagged, it is recommended that a site plan be developed. This site plan will identify surface waters, and the protective radii of wells on adjacent properties. Prior to doing any design work, it will be necessary to have a legible copy of a current as-built survey, or for new construction, a certified plot plan.

General Consultation Services

Minimize

 

  • Senior Professional Engineer - $175/hr.
  • Professional Engineer - $150/hr.
  • Senior Engineering Technician - $120/hr.
  • Engineering Technician - $95/hr.
  • CAD Technician - $60/hr.
  • Administrative Services - $55/hr.

     

Septic Design Services

Minimize

 

  • Site Plan - These charges will be deducted from the design charges if GEG, Ltd. is retained to do the design work. This fee is required before any services can be initiated:  $200
  • Soils Analysis - Includes percolation test and groundwater monitoring for one test hole:  $500
  • Soils Analysis for Additional Test Holes (if performed during the same site visit):  $250 per test hole
  • Conventional System Design *$800
  • Alternative Technology Designs, such as a Quaincs Aerocell System - *$900
    *Does not include waiver reports or MOA waiver fees.

 

Excavation Services

Minimize
  • Test Hole (if a rubber tire backhoe can be used) - *$600
  • Additional Test Hole - $300
  • Septic System Installation - Requires Bid
  • Other On-Site Excavation Services - Requires Bid
    *Additional mobilization prices may apply if the site location is further south than Potter Marsh, or further north than Peters Creek.  Some sites require extensive tree removal or construction of a road into the site.  Tree removal and/or road construction is not included in this price.  If the site topography or vegetation (tall trees and/or alders) makes the use of a rubber tire backhoe unfeasible, it may be necessary to use a track type backhoe.  There is an additional $500 fee if a track type backhoe is required.

Municipality of Anchorage Fees*

Minimize
  • Septic system installation permit - $530
  • Well permit - $200
  • Certificate of On-site Systems Approval (COSA) - $490
  • Municipal Rush Fee (24 hours) -varies
    *Based on MOA fee schedule. (Valid for 2010)

Inspections & Documentation*

Minimize
  • Conventional system with single trench/bed, no sand filter - $900
  • Conventional system with single trench/bed, sand filter - $1000
  • Conventional system, dual trenches, no sand filter - $1,100
  • Conventional system, dual trenches, sand filter - $1,200
  • Alternative Technology systems - $1,200
  • Lined Intermittent Sand Filter - $1,500
    *As required by the Municipality of Anchorage

 

Minimize

The aforementioned inspection charges are based upon the routine number of site visits for a standard installation. If additional inspections are required because of contractor construction methods or deficiencies, (with materials/construction) they will be performed at $150 per inspection.

Quick Links

Minimize

 

Minimize


 

3701 E. Tudor Road, Suite 101  ♦  Anchorage, Alaska 99507-1259
Phone: (907) 337-6179  ♦  Fax: (907) 338-3246

 

 


Copyright 2010 Garness Engineering Group, LTD.   Terms Of Use  Privacy Statement
  Login